News
Cold storage construction, equipment selection and operating guidance
Full articles are currently available in Chinese. These English summaries help you choose what to read.
Refrigeration Knowledge and Project Guides
10 articles
Choosing a Cold Storage Contractor in Zhangzhou: Five Points to Consider
Compare contractors by how well they understand your needs, explain the system plan, itemize the quotation, manage installation and support the completed project.
Read article in Chinese
How Much Does Cold Storage Installation Cost? Key Factors Behind a Quotation
Project costs depend on use, temperature zones, insulation, equipment and site conditions. Learn what to check when comparing quotations.
Read article in Chinese
Planning Cold Storage for Fresh Food and Produce
Plan around the products and workflow, including precooling, storage, temperature zones, airflow and daily management.
Read article in Chinese
Chilled vs. Frozen Storage: Choosing the Right Cold Room
Chilled and frozen rooms differ in product state, storage goals, temperature and system design. Understand what to consider before building or converting a room.
Read article in Chinese
Selecting a Refrigeration Unit for a Cold Room
Room volume is only one input. Products, loading patterns, operating conditions and system components also matter.
Read article in Chinese
Screw Units or Parallel Reciprocating Units: How to Compare
Compare compressor type and system layout against load variation, controls, business continuity and maintenance needs.
Read article in Chinese
Configuring Unit Coolers in Cold Storage
Unit coolers need to work with room layout, shelving and access routes. Review selection, airflow, defrost, drainage and operating checks.
Read article in Chinese
Selecting an Evaporative Condenser for Refrigeration
Check system compatibility, water supply and drainage, airflow and long-term maintenance alongside equipment capacity.
Read article in Chinese
Why Is a Cold Room Using More Electricity?
Check metering and changes in operations first, then inspect insulation, door use, equipment conditions and controls.
Read article in Chinese
From System Planning to Cold Storage Handover
Understand the steps from requirements and site checks to installation, commissioning and project handover.
Read article in Chinese